Mechanical Engineering / Makina Mühendisliği

Permanent URI for this collectionhttps://hdl.handle.net/11147/4129

Browse

Search Results

Now showing 1 - 4 of 4
  • Article
    Exergetic Analysis of a Continuous Bi-Axially Oriented Polypropylene (bopp) Film Unit in a Plastic Processing Plant
    (Inderscience Enterprises Ltd., 2009) Balta, M. Tolga; Hepbaşlı, Arif; Hancıoğlu, Ebru; Özcanlı, Şevket Cihangir; Yılmazer, Ertan; Yurdakul, İbrahim; Dişbudak, Özgür
    This paper deals with an exergy analysis of the stretching process of bi-axially oriented polypropylene films using a hot oil coiler along with stretching and crystallising unit. Exergy destructions and efficiencies in each of the system components are calculated, while the exergy loss and flow diagram (the so-called Grassmann diagram) is presented for the transverse direction (TD) unit. The so-called functional (on the product or benefit/fuel basis) and universal (on the output/input basis) exergy efficiency values of the TD unit are calculated to be 26.40% and 28.46% at a recommended exhaust air relative humidity of 0.0098 kg water/kg air, respectively.
  • Article
    Citation - WoS: 30
    Citation - Scopus: 36
    Overview of Kizildere Geothermal Power Plant in Turkey
    (Elsevier Ltd., 2004) Gökçen Akkurt, Gülden; Öztürk, Harun Kemal; Hepbaşlı, Arif
    Achieving sustainable development is a target that is now widely seen as important in worldwide public opinion. In this context, the utilization of renewable energy resources such as solar, geothermal and wind energy appears to be one of the most efficient and effective ways of achieving this target. Recently, power generation from geothermal energy has become of big importance in Turkey, which is located on the Mediterranean sector of the Alpine-Himalayan Tectonic Belt and is among the first seven countries in abundance of geothermal resources around the world. The main objective in doing the present study is twofold, namely: (a) to investigate Turkey's geothermal energy potential for power generation and (b) to overview the Denizli-Kizildere geothermal power plant (DKGPP) with an installed capacity of 20.4 MWe, which is at present the only operating geothermal power plant of Turkey. Based on the drilling data, which have been gathered to date, Turkey's geothermal energy potential for power generation is determined to be 764.81 MWe. Electricity generation projections of Turkey are also 500 MWe from Germencik, Kizildere, Tuzla and several of the other fields by the year 2010 and 1000 MWe by 2020. The Denizli-Kizildere geothermal field has an estimated capacity of 200 MWe. The DKGPP was put into operation in 1984 and has been operated since then. It produced an electrical energy of 89,597 MWh in 2001, representing an electric power of 10.6 MWe in the same year. Present applications have shown that in Turkey, geothermal energy is a promising alternative and can make a significant contribution towards reducing the emission of greenhouse gases. As the public recognizes the projects, the progress will continue.
  • Article
    Citation - WoS: 15
    Citation - Scopus: 16
    Geothermal Fields Suitable for Power Generation
    (Taylor and Francis Ltd., 2004) Gökçen Akkurt, Gülden; Öztürk, Harun Kemal; Hepbaşlı, Arif
    Turkey is located on the Mediterranean sector of Alpine-Himalayan Tectonic Belt with many grabens, acidic volcanism, hydrothermal alteration zones, numerous hot springs and fumaroles. The data gathered since 1962 indicate that Turkey has a high geothermal energy potential. By comparison, it is among the first seven countries in abundance of geothermal resources around the world, while the share of its potential used is only about 2%. This means that considerable studies on geothermal energy could be conducted in order to increase energy supply and to reduce atmospheric pollution in Turkey. The main objective of the present study is threefold, namely: (1) to overview Turkey's geothermal fields suitable for power generation together with their possible utilization opportunities, (2) to present problems encountered and research projects developed in the Denizli-Kizildere geothermal field with an estimated capacity of 200 MWe and (3) to assess the current status of geothermal energy use for electric energy production in Turkey. The Denizli-Kizildere geothermal power plant with an installed capacity of 20.4 MWe which is, at present, the only operating geothermal power plant of Turkey, was put into operation in 1984, while electricity from geothermal energy has been produced commercially since 1913. This plant produced on average an electrical energy of 84,920 MWh in the period between 1998-2001, representing an average electric power of 10.45 MWe in the same period. Parallel to the development of the geothermal energy utilization in the country, it is projected that, by the years 2010 and 2020, the total geothermal power installed capacity will increase to 500 MWe, respectively.
  • Article
    Citation - WoS: 55
    Citation - Scopus: 67
    Evaluating Performance Indices of a Shopping Centre and Implementing Hvac Control Principles To Minimize Energy Usage
    (Elsevier Ltd., 2004) Canbay, Çağlar Selçuk; Hepbaşlı, Arif; Gökçen Akkurt, Gülden
    Heating, ventilating and air-conditioning (HVAC) systems in buildings must be integrated with an efficient control scheme to maintain comfort under any load conditions. Efficient HVAC control is often the most cost-effective option to improve the energy efficiency of a building. However, HVAC processes are non-linear, and characteristics change on a seasonal basis so the effect of changing the control strategy is usually difficult to predict. The present study aims to reduce energy consumption by defining new HVAC control strategies and tuning control loops in a shopping centre. First, an energy audit was performed to investigate the potential for energy savings and to redefine the control scenarios, while a methodology for the shopping centre was developed. Performance indices were then calculated and compared with the yardsticks. Next, normalised performance indices were computed to reach out a better understanding of the building's efficiency. Finally, new strategies were implemented with the help of the existing building management system (BMS) and about 22% of energy saving was achieved.