Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
Permanent URI for this collectionhttps://hdl.handle.net/11147/7148
Browse
3 results
Search Results
Now showing 1 - 3 of 3
Article Citation - WoS: 13Citation - Scopus: 16The Injection of Co2 To Hypersaline Geothermal Brine: a Case Study for Tuzla Region(Elsevier Ltd., 2019) Topçu, Gökhan; Koç, Gonca A.; Baba, Alper; Demir, Mustafa MuammerScaling is a serious issue for geothermal power plants since it remarkably decreases the harvesting of energy. The reduction of pH by organic acids whose structure is close to CO2 for instance formic acid has been an effective solution for the minimization of scaling. Herein, the effect of CO2 injection on the formation of scaling particularly metal-silicates was investigated for the model case of Tuzla Geothermal Field (TGF) located in the northwest of Turkey. CO2 has an acidic character in aqueous systems because it leads to the formation of carbonic acid. The injection of 20.6 m3/s CO2 (approximately 88 ppm) to hypersaline brine of TGF is a promising green approach for both mitigation of scaling by reducing pH from 7.2 to 6.2 at the well-head and the minimization of potential corrosion compared to the use of formic acid (55 ppm).Article Citation - WoS: 25Citation - Scopus: 32District Heating System Design for a University Campus(Elsevier Ltd., 2006) Yıldırım, Nurdan; Toksoy, Macit; Gökçen Akkurt, Güldenİzmir Institute of Technology campus is in use since 2000 and still under development. At present, heating is provided by individual fuel boilers. On the other hand, the campus has a geothermal resource in its borders with a temperature of 33 °C. Because of this low geothermal fluid temperature; heat pump district heating system is considered for the campus. As an alternative, fuel boiler district heating system is studied. Each heating system is simulated using hourly outdoor temperature data. For the simulations, a control system with constant flow rate and variable return water temperature is used and the main control parameter is the indoor temperature. Various heating regime alternatives have been studied for heat pump district heating system for the various condenser outlet temperature and geothermal fluid flow rate, and two of these alternatives are given in this study. Furthermore, economic analysis has also been done for each heating system alternative based on investment and operational costs. Results indicate that heat pump district heating system has the highest investment but lowest operational cost. The alternatives are evaluated according to internal rate of return method, which shows the profit of the investment and resulted that, the heat pump district heating system has minimum 3.02% profit comparing with the fuel boiler district heating system at the end of the 20-year period.Article Citation - WoS: 30Citation - Scopus: 36Overview of Kizildere Geothermal Power Plant in Turkey(Elsevier Ltd., 2004) Gökçen Akkurt, Gülden; Öztürk, Harun Kemal; Hepbaşlı, ArifAchieving sustainable development is a target that is now widely seen as important in worldwide public opinion. In this context, the utilization of renewable energy resources such as solar, geothermal and wind energy appears to be one of the most efficient and effective ways of achieving this target. Recently, power generation from geothermal energy has become of big importance in Turkey, which is located on the Mediterranean sector of the Alpine-Himalayan Tectonic Belt and is among the first seven countries in abundance of geothermal resources around the world. The main objective in doing the present study is twofold, namely: (a) to investigate Turkey's geothermal energy potential for power generation and (b) to overview the Denizli-Kizildere geothermal power plant (DKGPP) with an installed capacity of 20.4 MWe, which is at present the only operating geothermal power plant of Turkey. Based on the drilling data, which have been gathered to date, Turkey's geothermal energy potential for power generation is determined to be 764.81 MWe. Electricity generation projections of Turkey are also 500 MWe from Germencik, Kizildere, Tuzla and several of the other fields by the year 2010 and 1000 MWe by 2020. The Denizli-Kizildere geothermal field has an estimated capacity of 200 MWe. The DKGPP was put into operation in 1984 and has been operated since then. It produced an electrical energy of 89,597 MWh in 2001, representing an electric power of 10.6 MWe in the same year. Present applications have shown that in Turkey, geothermal energy is a promising alternative and can make a significant contribution towards reducing the emission of greenhouse gases. As the public recognizes the projects, the progress will continue.
