Master Degree / Yüksek Lisans Tezleri
Permanent URI for this collectionhttps://hdl.handle.net/11147/3008
Browse
2 results
Search Results
Master Thesis Experimental and Numerical Investigation of the Evolution of Piping and Resulting Breach in Earth-Fill Dams(01. Izmir Institute of Technology, 2022) Tayfur, Gökmen; Tayfur, Gökmen; 03.03. Department of Civil Engineering; 03. Faculty of Engineering; 01. Izmir Institute of TechnologyEarth-fill dams have been constructed for decades by compacting natural soil materials near the dam site. Piping is of the most important causes of their failure. In the scope of this thesis, 2 m in length homogenous earth-fill dams were constructed in a rectangular flume in the laboratory of the Izmir University of Economics. The experimental and numerical investigations on a breach by generating piping were realized with different weak zone scenarios. Three experiments were performed by placing a weak layer cross-section 5x5 cm2 at the dam bottom center. One scenario was performed by locating a weak layer of 2x2 cm2, 28 cm above the bottom. Temporal breach areas and the breach-wetted areas are evaluated on scaled screenshots by using Gauss’s area formulation. The Temporal breach discharges were calculated from the continuity equation. Furthermore, finite element analyses on the breaching of homogenous earth-fill dams in different scenarios were performed by comparing the hydraulic gradient with the critical value. In addition to the bottom and middle scenarios, two upper scenarios were also modeled. The water depths were used for each scenario to represent the experimental conditions, and some approaches were made for the weak zones. To simulate the breach mechanism with different loops, a python algorithm was integrated with the Jupyter console. As a result of the simulations, it has been observed that the findings obtained by simulations were in accord with the experimental studies, and the dams were exposed to backward piping starting from downstream towards upstream.Master Thesis Experimental and Numerical Investigation of Piping in Uniform Embankment Dam With Weak Layer at the Upper Region(Izmir Institute of Technology, 2022) Tayfur, Gökmen; Tayfur, Gökmen; Bor Türkben, Aslı; 03.03. Department of Civil Engineering; 03. Faculty of Engineering; 01. Izmir Institute of TechnologyFrom the past to nowadays, earth-fill dams have been built thanks to their advantages, however, piping is a problem that earth-fill dams can experience and then fail. While there are many studies about the overtopping failures of the dams, there are not too many surveys about dam failures due to piping. Dams having a height of 0.6 m, a bottom width of 2 m, and a crest width of 0.20 m were built in a channel of 1 m wide, 0.81 m high and 6.14 m long. 3 different scenarios have been created and the evolution of dam failure resulting from seepage at the dam was recorded by six cameras located at different locations. In the closed system, water was pumped from the lower reservoir to the upper channel. The dam was constructed by using a mixture consisting of 85 % sand and 15 % clay. A circular tunnel with a diameter of 2 cm was created at the middle or corner of the dam according to the scenario and at 6 cm below the dam crest. The breach areas at different time instants at upstream and downstream sides are determined by using the Gauss Area calculation method and by image processing, and then it has been found that methods give close values to each other. Breach discharge and time-varied velocity values were determined by using the continuity equation. Empirical relations were intended to be derived for the breach flow rate and empirical relations represented in the literature were trialed by using experimental findings.
