Civil Engineering / İnşaat Mühendisliği
Permanent URI for this collectionhttps://hdl.handle.net/11147/13
Browse
2 results
Search Results
Article Citation - WoS: 8Citation - Scopus: 13Masonry Buildings Subjected To Settlements: Half-Scale Testing, Detailed Measurements, and Insights Into Behaviour(Elsevier, 2023) Dalgıç, Korhan Deniz; Gülen, Burcu; Liu, Yiyan; Açıkgöz, Sinan; Burd, Harvey; Maraşlı, Muhammed; İlki, AlperIndustry procedures to assess the risk of settlement-induced damage to masonry buildings ignore key aspects of the problem, such as the influences of building weight, façade openings, and floor structures. Experimental data are needed to characterise the influence of these aspects on damage. This paper describes tests on three brick masonry half-scale building models subjected to settlements. The use of scaling rules in choosing the model materials and kentledge, the settlement apparatus, and the cross-validation of displacement and strain measurements are presented. Comparative evaluation of building responses show that: (i) the distribution of building weight and the resulting in-situ stresses play a key role in determining compliance to settlements, (ii) openings make the structure vulnerable to cracking and (iii) floor slabs stiffen and strengthen the building and prevent the formation of damage in the upper floors, leading to a concentration of damage at the ground storey.Article Citation - WoS: 1Citation - Scopus: 2Consolidation of a Bath Ruin in an Archaeological Site(Taylor and Francis Ltd., 2022) Durmuşlar, Feyza; Turan, Mine; Yücetürk, Kutay; Aktaş, EnginThe study has focused on consolidation of a historical bath ruin in an archaeological site. Cevher Pasa Bath, which is located in Tabae archaeological site in Denizli, Turkey and dated to the 15th century, presents structural problems. The aim of the study is to propose a framework for planning consolidation of the ruins of Cevher Pasa Bath so that conservation work regarding similar masonry ruins in archaeological sites can be guided. Thus, methods of architectural restoration and civil engineering are combined in an interdisciplinary scope. Provision of temporary shoring as an emergency intervention, consolidation and presentation of the ruin within the scope of an interdisciplinary restoration project, and monitoring of the asset within the frame of a monument management plan are suggested, respectively. Structural analysis considering stress and overturning moment checks are performed. Consolidation work includes only supporting of arch remains. Some walls of the ruin are weaker than other parts. These parts need further detailed analysis, and if necessary, further consolidation and strengthening are to be carried out. The monument management plan points out the necessity of collaboration of local and central administrations, and also non-governmental organisations.
