Computer Engineering / Bilgisayar Mühendisliği
Permanent URI for this collectionhttps://hdl.handle.net/11147/10
Browse
2 results
Search Results
Article Citation - WoS: 41Citation - Scopus: 50Bim-Carem: Assessing the Bim Capabilities of Design, Construction and Facilities Management Processes in the Construction Industry(Elsevier, 2023) Gökçen, Yılmaz; Akçamete, Aslı; Demirörs, OnurBIM adoption has accelerated worldwide since it is an important enabling technology for digitalisation in the construction industry. Adopting BIM requires transforming the traditional building life cycle stages (planning, design, construction and facilities management) into BIM-integrated project deliveries. Assessing the BIM ca- pabilities of these stages helps organisations to identify gaps in their BIM uses and improve them. There is a lack of a comprehensive model in the literature for assessing the BIM capabilities of individual building life cycle stages and their processes. Existing assessment models focus on assessing the BIM maturity of construction projects and organisations which do not inform the required BIM improvements for individual stages and their processes. Hence, we iteratively developed the Building Information Modelling (BIM) Capability Assessment REference Model (BIM-CAREM) and demonstrated its usability through multiple explanatory case studies per- formed with two international design and engineering companies and two general contractors in Turkey. We assessed the BIM capabilities of design, construction and facility management processes of various buildings i.e. residential, stadiums, hospitals and airports. The results showed that the BIM capability levels of design, con- struction and facility management processes vary within and across the companies.Article Citation - WoS: 12Citation - Scopus: 21A Change Management Model and Its Application in Software Development Projects(Elsevier, 2019) Efe, Pınar; Demirörs, OnurChange is inevitable in software projects and software engineers strive to find ways to manage changes. A complete task could be easily in a team's agenda sometime later due to change demands. Change demands are caused by failures and/or improvements and require additional effort which in most cases have not been planned upfront and affect project progress significantly. Earned Value Management (EVM) is a powerful performance management and feedback tool for project management. EVM depicts the project progress in terms of scope, cost, and schedule and provides future predictions based on trends and patterns of the past. Even though EVM works quite well and widely used in disciplines like construction and mining, it is not the case for software discipline. Software projects require special attention and adoption for change. In this study, we present a model to measure change and subsequent rework and evolution costs to monitor software projects accurately. We have performed five case studies in five different companies to explore the usability of the proposed model. This paper depicts the proposed model and discusses the results of the case studies.
