Heat Load Factor for Geothermal District Heating System Design
Loading...
Date
Authors
Yıldırım, Nurdan
Gökçen, Gülden
Journal Title
Journal ISSN
Volume Title
Open Access Color
OpenAIRE Downloads
OpenAIRE Views
Abstract
Design of heating systems using conventional fuels is based on peak load which is calculated according to the coldest outdoor design temperature. But in geothermal district heating system design it is common practice to use a heat load factor between 0.6-0.7 since the resource is continues, cheap and system can be run for 24 hours a day. Heat load factor can be defined as a ratio of actual heat load to design heat load of the system. In this study, a geothermal district heating system is designed for Izmir Institute of Technology Campus, Izmir, Turkey and simulated for a heat load factor range of 0.5-1. For the Campus case, the heat load factor is determined as 0.53-0.0.67 based on indoor air temperature and operational cost.
Description
19th International Conference on Efficiency, Cost, Optimization, Simulation and Environmental Impact of Energy Systems (ECOS 2006)
Keywords
geothermal district heating systems, heat load factor, Izmir Institute of Technology, Turkey
Fields of Science
Citation
WoS Q
Scopus Q
Volume
Issue
Start Page
1245
End Page
+
