Adapting Spice for Development of a Reference Model for Building Information Modeling - Bim-Carem
| dc.contributor.author | Yılmaz, Gökçen | |
| dc.contributor.author | Akçamete, Aslı | |
| dc.contributor.author | Demirörs, Onur | |
| dc.coverage.doi | 10.1007/978-3-030-00623-5_9 | |
| dc.date.accessioned | 2018-12-17T12:12:25Z | |
| dc.date.available | 2018-12-17T12:12:25Z | |
| dc.date.issued | 2018 | |
| dc.description | 18th International Conference on Software Process Improvement and Capability Determination, SPICE 2018; Tessaloniki; Greece; 9 October 2018 through 10 October 2018 | en_US |
| dc.description.abstract | Building Information Modelling (BIM) is highly adopted by Architecture, Engineering, Construction and Facilities Management (AEC/FM) companies around the world due to its benefits such as improving collaboration of stakeholders in projects. Effective implementation of BIM in organizations requires assessment of existing BIM performances of AEC/FM processes. We developed a reference model for BIM capability assessments based on the meta-model of the ISO/IEC 330xx (the most recent version of SPICE) family of standards. BIM-CAREM can be used for identifying the BIM capabilities of the AEC/FM processes. The model was updated iteratively based on the expert reviews and an exploratory case study, and was evaluated via four explanatory case studies. The assessment results showed that the BIM-CAREM is capable of identifying BIM capabilities of specific processes. In this paper, we present how we utilized ISO/IEC 330xx for developing BIM-CAREM as well as the iterations of the model and one of the explanatory case studies as an example. | en_US |
| dc.description.sponsorship | Pamukkale University with project number 2018KKP219 | en_US |
| dc.identifier.citation | Yılmaz, G., Akçamete, A., and Demirörs, O. (2018). Adapting SPICE for development of a reference model for building information modeling - BIM-CAREM. In I. Stamelos, R. V. O'Connor, T. Rout, and A. Dorling (Eds.), Software Process Improvement and Capability Determination. SPICE 2018. Communications in Computer and Information Science, (pp. 119-135). Cham: Springer. doi:10.1007/978-3-030-00623-5_9 | en_US |
| dc.identifier.doi | 10.1007/978-3-030-00623-5_9 | en_US |
| dc.identifier.doi | 10.1007/978-3-030-00623-5_9 | |
| dc.identifier.isbn | 978-3-030-00622-8 | |
| dc.identifier.scopus | 2-s2.0-85054811846 | |
| dc.identifier.uri | https://doi.org/10.1007/978-3-030-00623-5_9 | |
| dc.identifier.uri | https://hdl.handle.net/11147/7046 | |
| dc.language.iso | en | en_US |
| dc.publisher | Springer Verlag | en_US |
| dc.relation.ispartof | International Conference on Software Process Improvement and Capability Determination, SPICE 2018 | en_US |
| dc.rights | info:eu-repo/semantics/openAccess | en_US |
| dc.subject | BIM capability | en_US |
| dc.subject | ISO/IEC 330xx | en_US |
| dc.subject | Building Information Modeling | en_US |
| dc.subject | SPICE | en_US |
| dc.subject | Architectural design | en_US |
| dc.title | Adapting Spice for Development of a Reference Model for Building Information Modeling - Bim-Carem | en_US |
| dc.type | Conference Object | en_US |
| dspace.entity.type | Publication | |
| gdc.author.institutional | Demirörs, Onur | |
| gdc.author.yokid | 167231 | |
| gdc.bip.impulseclass | C5 | |
| gdc.bip.influenceclass | C5 | |
| gdc.bip.popularityclass | C5 | |
| gdc.coar.access | open access | |
| gdc.coar.type | text::conference output | |
| gdc.collaboration.industrial | false | |
| gdc.description.department | İzmir Institute of Technology. Computer Engineering | en_US |
| gdc.description.endpage | 135 | en_US |
| gdc.description.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
| gdc.description.scopusquality | N/A | |
| gdc.description.startpage | 119 | en_US |
| gdc.description.volume | 918 | en_US |
| gdc.description.wosquality | N/A | |
| gdc.identifier.openalex | W2891560538 | |
| gdc.index.type | Scopus | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.impulse | 1.0 | |
| gdc.oaire.influence | 2.9007914E-9 | |
| gdc.oaire.isgreen | true | |
| gdc.oaire.keywords | SPICE | |
| gdc.oaire.keywords | Information theory | |
| gdc.oaire.keywords | Exploratory case studies | |
| gdc.oaire.keywords | Building Information Modeling | |
| gdc.oaire.keywords | Facilities management | |
| gdc.oaire.keywords | Architectural design | |
| gdc.oaire.keywords | Building Information Model - BIM | |
| gdc.oaire.keywords | Reference modeling | |
| gdc.oaire.keywords | Information management | |
| gdc.oaire.keywords | Project management | |
| gdc.oaire.keywords | Capability assessment | |
| gdc.oaire.keywords | BIM capability | |
| gdc.oaire.keywords | Process engineering | |
| gdc.oaire.keywords | Building Information Modelling | |
| gdc.oaire.keywords | ISO Standards | |
| gdc.oaire.keywords | ISO/IEC 330xx | |
| gdc.oaire.keywords | ISO/IEC | |
| gdc.oaire.popularity | 2.1409619E-9 | |
| gdc.oaire.publicfunded | false | |
| gdc.oaire.sciencefields | 0211 other engineering and technologies | |
| gdc.oaire.sciencefields | 02 engineering and technology | |
| gdc.oaire.sciencefields | 0202 electrical engineering, electronic engineering, information engineering | |
| gdc.openalex.collaboration | National | |
| gdc.openalex.fwci | 0.59397163 | |
| gdc.openalex.normalizedpercentile | 0.63 | |
| gdc.opencitations.count | 0 | |
| gdc.plumx.mendeley | 22 | |
| gdc.plumx.scopuscites | 2 | |
| gdc.scopus.citedcount | 2 | |
| relation.isAuthorOfPublication.latestForDiscovery | 478fdf31-7c73-4f1a-94a4-2775adf0cec4 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | 9af2b05f-28ac-4014-8abe-a4dfe192da5e |
